A quartz key coat decides whether a thin coat render grips the wall or slides on it. Cerplast is the Atlas answer: a ready-to-use acrylic mass filled with quartz flour, rolled or brushed over a cured base-coat so the finish has something rough and evenly absorbent to bite into.

What a Quartz Key Coat Does Between Base-coat and Finish

Four things make the case for this key coat, and only one of them is adhesion.

  • Grip. The aggregate develops the effective surface between the two layers and leaves a deliberately rough film — what the wet render keys into, and what stops it slipping as it is pulled up.

  • Even suction. Cerplast limits how fast the substrate pulls water out of fresh render, so a patchy wall stops behaving like several walls at once.

  • A chemical barrier. The dried film is described as a barrier between substrate and render that limits colour bleed from below and the stains it produces on the finished surface. Under a light finish on a repaired or discoloured wall, that is usually the property which earns the money.

  • A named component, not an approximate match. Cerplast is listed by name in both product sheets of a UK system certificate, so a specification can point at the document rather than at a description.

Adhesion to concrete is stated twice in the same technical sheet, and not identically: the properties paragraph gives min. 1.0 MPa, the technical data table gives > 1.0 MPa. At least 1.0 MPa holds either way, and that is the figure to put in a specification.

Cerplast in Numbers — the Manufacturer's Own Figures

Property

Documented value

Composition

Acrylic resins and quartz flour

Density, ready to use

Approx. 1.5 g/cm³

Adhesion to concrete

At least 1.0 MPa

Consumption

0.3 kg/m² on average

Drying before rendering

4 to 6 hours

Working temperature

+5 °C to +30 °C

Application

Roller, brush or machine

Pack sizes

5, 10, 15 and 25 kg buckets

Shelf life

12 months from production date

Colour

White base, seven DEKO M shades, SAH tinting

Rate inside BBA 13/5018

0.25 to 0.35 kg/m², system scope

 

Coverage and How Many Buckets a Wall Takes

Consumption is declared per square metre and tubs are bought whole, so the arithmetic is worth doing once.

  • At the average rate of 0.3 kg/m²: 25 ÷ 0.3 = about 83 m² from one bucket.

  • At the upper rate the BBA certificate applies to key coats inside its build-up, 0.35 kg/m²: 25 ÷ 0.35 = about 71 m².

Order against the higher rate and the wall never runs short: 100 m² works out at 100 ÷ 71 = 1.4, so two tubs, with the balance absorbed by reveals and rough patches. On a smooth, well-prepared base-coat the average rate is realistic and one tub covers most of a semi-detached gable.

Colour: One White Base and Seven Matched Shades

Cerplast leaves the factory white, which is why it works as a barrier under pale finishes, and we tint it at the counter while an order is made up. Beyond white it is made in seven shades matched to the DEKO M mosaic renders:

  • White, brown, clinker, graphite, sand, grey and coffee — the shade for a particular DEKO M pattern is printed in that render's own technical sheet.

  • Tinted to the SAH Colours of Renders and Paints: 400 shades on the July 2023 English sheet, 418 on the May 2025 Polish one. Specify against 400 and the shade exists in either.

    Branch Address

    1 - 3 Palmer Street

    Weston-Super-Mare, BS23 1RP

    Opening Hours

    Monday - Friday:    8:00am - 5:00pm

    Saturday:                8:00am - 2:00pm

    Sunday:                                  Closed

    bottom of page